31.3 C
Lagos
Saturday, February 22, 2025

Tag:UNDP/GEF Renewable Energy Programme

Investors seek to unlock low-cost capital for renewable energy venture

Lack of local capital – one of the challenges facing large-scale renewable energy development in Nigeria – was the fulcrum of discussion at a...

Renewable energy: Stakeholders validate training manual for mini-grid developers

A draft training manual/curriculum detailing the knowledge required for a developer in the mini-grid space to be able to successfully execute Interconnected Mini-Grids (ICM)...

Study: West Africa leads in renewable energy, energy efficiency

The ECOWAS Renewable Energy and Energy Efficiency Status Report,  produced collaboratively by REN21 and ECREEE with lead authorship from the Worldwatch Institute, provides a regional perspective on the renewable energy and...

Nasarawa villages get access to sustainable energy

Three rural communities in North Central Nigeria are beneficiaries to a scheme designed to give countryside folks access to sustainable energy and boost their...

Energy efficiency: UNDP, GEF, SON set refrigerating appliances standard

Minimum energy performance standards (MEPS) for refrigerating appliances emerged last week in Lagos as the Standards Organisation of Nigeria (SON) rallied a team of...

Latest news

Experts take first step towards GEF-9 replenishment

With less than five years on the clock to meet key international environmental targets, experts gathered this week to...
- Advertisement -spot_imgspot_img

Coastal highway: Construction begins in Cross River, Akwa Ibom in March

Construction on Sections 3A and 3B of the Lagos-Calabar Coastal Highway, located in Cross River and Akwa Ibom respectively,...

Five candidates cleared for AfDB presidency race – Committee

The race to lead the African Development Bank (AfDB) has officially begun with the release of the list of...

Must read

Experts take first step towards GEF-9 replenishment

With less than five years on the clock to...

Coastal highway: Construction begins in Cross River, Akwa Ibom in March

Construction on Sections 3A and 3B of the Lagos-Calabar...
×